What to document before hiring a contractor
Keep the written estimate, scope of work, payment schedule, proposed start date, expected completion window, major material selections, and anything the contractor says is excluded. If a detail matters to the price or the finished result, get it into the written record before work starts.
Practical rule: If you would be upset to hear “that wasn't included,” make sure the item is written into the scope.
How to compare contractor bids
Do not compare only the total price. Put each bid side by side and compare scope, materials, allowances, exclusions, payment timing, warranty language, cleanup, permits, and schedule assumptions. A lower bid can become more expensive if important work is missing.
Practical rule: Normalize the bids first. Make sure each contractor is pricing the same job.
How to document a change order
Before changed or added work begins, write down what is changing, the added or reduced cost, whether the schedule changes, who approved it, and the date. Keep the change order with the original scope so the project history stays clear.
Practical rule: No price change should live only in a phone call or text thread.
What to photograph during a renovation
Take wide photos for context, close photos for details, and a photo with a recognizable object for scale when size matters. Photograph hidden work before it is covered, material labels, damaged areas, corrections, and completed milestones.
Practical rule: Label photos by date and area while you still remember what they show.
How to build a useful punch list
Walk the project area slowly and write one issue per line. Include the location, what needs correction, a photo reference when useful, and the date the item was completed. Avoid vague entries such as “fix trim.” Write exactly which trim and what is wrong with it.
Practical rule: A punch list should be specific enough that someone who was not on the walkthrough could understand it.